Target Store, Cincinnati OH. The 100,000 sq.ft target store project had two failed foundations on the north and south walls. As a result, both walls to roll outward. A total of 110 MAGNUM Steel Push Piers were installed on 250’ of the south wall and 330′ of the north wall. The south wall had settled 1.5” and had settled 2.5”. The walls were successfully lifted, rolled inward and stabilized in 14 days. This remedial solution kept the project on track and saved hundreds of thousands of dollars in delays and replacement costs.
Additional information
Products Used | MP6000K Ram Kit, MP313 Push Pier |
---|
Description
Target Store, Cincinnati OH. The 100,000 sq.ft target store project had two failed foundations on the north and south walls. As a result, both walls to roll outward. A total of 110 MAGNUM Steel Push Piers were installed on 250’ of the south wall and 330' of the north wall. The south wall had settled 1.5” and had settled 2.5”. The walls were successfully lifted, rolled inward and stabilized in 14 days. This remedial solution kept the project on track and saved hundreds of thousands of dollars in delays and replacement costs.